HYDRO POWER PROJECTS
Ongoing Projects
Brief Scope of Works : Details surveys investigations and preparation of Feasibility Study and Environmental Impact Assessment (EIA) Study Report.
Name of Client : Departments of Electricity Development (DOED) Under ministry of Energy, Water Resources and Irrigation Government of Nepal.
Location of Project : Nepal
Commencement Date : March 2020
Project : KANDADJI ECOSYSTEM REGENERATION AND NIGER VALLEY ENHANCEMENT PROGRAM.
Name of Client : KANDADJI DAM AGENCY (ABK), Niger
Duration Of Contract : 72 Months
About the Project :
Kandadji Hydroelectric Dam is an important elementof the Kandadji Ecosystem Regeneration and Development Program of the Niger Valley.
The dam will be used for the production of energy of 130 MW by the 4 groups, protection against floods and irrigation.
Most of the dam will be earth and of the homogeneous backfill type, 8.4 Km long and a maximum height of 26m.
Services Provided by EIPL :
EIPL shall provide following consultancy services for the project :
- Mission 1: Preparation of Detailed Project Report / Engineering Report.
- Mission 2: Implementation Plans.
- Mission 3: Supervision of
works and provisional acceptance.
- Mission 4: Monitoring of the implementation of Environmental Management Plans and Social work sites developed by companies
- Mission 5: Assistance to the Contracting Authority.
- i) Assistance provided during the warranty period
- ii) Assistance offered to the Owner for Operation and Maintenance.
- iii) Technology Transfer and training of the Client's staff
Brief Scope of Works : Consultancy services for Hale Hydropower Plant Rehabilitation Project, Tanzania
Name of Client : Tanzania Electric Supply Company Limited (TANESCO)
Location of Project : Tanzania
Duration Of Contract : June 2015 – June 2020
About the Project :
The Government of Tanzania through TANESCO has decided to rehabilitate Hale hydropower plant in Tanga Region. Presently the power plant is suffering from general aging and wear and tear. One generator is completely down and the rest of the plant is in obsolete condition. The Government intends to have the station rehabilitated back to its full capacity of 21 MW.
The project shall be carried out in accordance the following documents :
- Rehabilitation of Hale Hydropower Plant in Tanga Region, Tanzania, Final Project Document, 4 December 2007 (PD 2007)
- Rehabilitation of Hale Hydropower Plant in Tanga Region, Tanzania, Final Feasibility Study Report, 7 December 2007 (FS 2007)
- Rehabilitation of Hale Hydropower, UPDATE of Final Feasibility Study Report, 8 November 2010 (FS 2010 Update)
Services Provided by EIPL :
In association with SWECO, Sweden, EIPL has been appointed as Client’s Engineer by TANESCO for providing consultancy services for rehabilitation of Hale Hydropower Plant on Pangani River. The Contract Agreement has been signed by SWECO & EIPL.
EIPL’s scope of work includes :
- Update the Existing feasibility report for Rehabilitation of Hale Hydropower Plant
- Prepare Tender Documents and provide assistance in evaluation and selection of EPC contractors
- All works related to civil structures of the project including all investigations, testings Review of Designs, Project Management, contract administration.
- Supervision of rehabilitation/construction of civil structures, Construction as Client’s Engineer at site.
Brief Scope of Works : Owner's Engineers for Review of Designs, Factory Inspections, Quality Assurance, Site Supervision and Commissioning of 44 MW Singrobo - Ahouaty Hydropower Project, Ivorie Cote.
Name of Client :Ivorie Hydro Energy SA (IHE), Africa
Location of Project :Ivorie Cote
Commencement Date : Jan 2019
-
Water Intake system Raipur USTPP
Brief Scope of Works :
- Study of Water Availability & Intake for Raipur USTPP
- Detailed Expansion Project
- Design of Intake
-
Water Intake System Kawai USTPP
Brief Scope of Works :
- Study of Water Availability & Intake for Kawai USTPP
- Detailed Expansion Project
- Design of Intake
-
Raigarh USTPP
Brief Scope of Works :
- Water Availability Study for Raigarh USTPP
- Detailed Expansion Project
Name of Client : Adani Power Limited
Location of Project : Chhattisgarh
Commencement Date : 08-02-2024
Name of Client : Adani Power Limited
Location of Project : Rajisthan
Commencement Date : 22-03-2024
Name of Client : Adani Power Limited
Location of Project : Chhattishgarh
Commencement Date : 12-02-2024
Brief Scope of Works : Preparation of Pre feasibility Report of 35 Pump Storage Power Project
Name of Client : GSECL
p>Location of Project : GujaratCommencement Date : 26-03-2024
Brief Scope of Works : Site Identification & preparation of Pre Feasibility report of PSP Project
Name of Client : JSW
Location of Project : Maharashtra & Uttrakhand
Commencement Date : 17-01-2024
-
Tamil Nadu:
Brief Scope of Works : Preparation of Pre Feasibility report of PSP Project
Name of Client : Adani Power Limited
Location of Project : Alleri & Thenamalai
Commencement Date : March 2024
-
Telangana:
Brief Scope of Works : Preparation of Pre Feasibility report of PSP Project
Name of Client : Adani Power Limited
Location of Project : Nacharam & Koyabestagudem
Commencement Date : March 2024
Projects: 120 MW Rangit-IV Hydro-electric Project in Sikkim, 96MW Rongnichu Hydro-electric Project in Sikkim, 24 MW Selti Musrang Hydroelectric Project in Himachal Pradesh, Project Management Services for 18 MW Saptdhara Hydroelectric Project, Orissa
Brief Scope of Works :EIPL provides following consultancy services for execution of Lender’s Engineering services.
Name of Client : Power Finance Corporation & Rural Electrification Corporation
Services Provided by EIPL :
Power Finance Corporation & Rural Electrification Corporation has appointed M/s Energy Infratech Private Limited (EIPL) as Lender Engineers (LE) for providing consultancy services for financing of various Projects.PHASE I : DUE DILIGENCE(Pre-Financial closure):
Critical Review of Project System Design and agreements covering: Conceptual Design, Power Purchase agreement, Turnkey/ packages/Sub package contracts including non EPC items for engineering procurement, construction, start up, Hydrology and Power potential, Adequacy of Power evacuation arrangements, Infrastructure availability and adequacy, Environmental issues, if any, Review and acceptance of Disbursement schedule
PHASE II : IMPLEMENTATION
PHASE III : POST COMMISSIONING
Project : Technical Study for Preparation of Feasibility Study (Detailed Project Report) & Tender Specification of Ruzizi-IV Hydro Power Project
Brief Scope of Works : Preparation of Feasibility Study Report & Tender Specifications
Name of Client : Organisation for the Energy of Great Lakes Countries (EGL)
Location of Project : RAWANDA, BURUNDI & DR CONGO
Lender : AFRICAN DEVELOPMENT BANK (AFDB)
Commencement Date : 18-07-2024
Project : Construction Supervision of Improvement of Electric Sector of DR CONGO (PAGASE)
Scope of Works :
- Engineering Review
- Construction Supervision of rehabilitation of Inga Hydro Poer Project & Exanpansion of Lungudi Hydro Power Project.
- Refurishment of Electrical Transmission & Distribution System
Name of Client : Ministry of Hydraulic & Electricity Resources
Location of Project : RAWANDA, BURUNDI & DR CONGO
Lender : AFRICAN DEVELOPMENT BANK (AFDB)
Commencement Date : 29-04-2024
Project : Preparation of Detailed Project Report (DPR) of Upper Bhavani Pumped Storage Project (4X250MW), TamilNadu
Scope of Works :
- Survey of Investigation
- Engineering Studies
- EIA/EMP Studies Including MOEF'S Clearance
- Economic & Financial Analysis
Name of Client : NTPC Tamil Nadu Energy Company LTD (NTECL),
AJoint Vendture of NTPC Ltd & TANGEDCO
Location of Project : Nilgris(Tamil Nadu)
Commencement Date : 23-07-2024
Project : Preparation of Detailed Project Report for Pumped Storage Hydropower Projects at various locations in the state of Gujarat.
Scope of Works :
- Survey of Investigation
- Engineering Studies
- EIA/EMP Studies Including MOEF&CC Clearance
- Economic & Financial Analysis
Name of Client : Gujarat State Electricity Cooperation Limited
Location of Project : Gujarat
Commencement Date : 15-10-2024